Search in program

en of
and or
and or
till

Klokgebouw information

01

Photo © Boudewijn Bollmann


Klokgebouw 2012


New plans have been developed for the Klokgebouw this year. During DDW 2012 it will show work with a focus on industrial design. This means that the Klokgebouw holds place for / is available for design agencies, manufacturers, labels and brands.
For individual designers, collectives and recently graduated designers that present work with an emphasis on conceptual design, there are former offices available on a new location at Strijp-S, the SX/Videolab building. Click here for more information on SX/Videolab.

Rates

  • € 60/m2 for educational institutes
  • € 90/m2 for design agencies, manufacturing industries, labels en brands


The minimum purchase is 20 m2.
Prices are exclusive of VAT, per m2, and for nine days.

Facilities

Extra facilities
After approval you can specify additional facilities such as presentation blocks, the use of an access platform/fork-lift truck, extra lighting, under the tab ‘Klokgebouw’ in your account. You can indicate your requirements until September 1, 2012 at the latest. Questions can be sent by email to: klokgebouw@ddw.nl.

Interior
The lots in Hall 3 and 4 can be build up with blocks. The exhibitor is required to leave the blocks undamaged after use. It is not allowed to drill, hammer in nails or paint the blocks. Temporary fastening is allowed, provided the blocks are left undamaged. The lots have no carpeting.
The blocks are available in three sizes: 

  • 45 x 45 x 90 cm, white
    Rental € 50 (excl. VAT) per block
  • 45 x 90 x 90 cm, white
    Rental € 60 (excl. VAT) per block
  • 45 x 90 x 180 cm, white
    Rental € 70 (excl. VAT) per block

Lighting
The lots are provided with lighting (white light) from above. The lamps can be directed to your wishes. Anything extra you want, for example a different colour, more and/or specific lighting can be ordered. You can specify this in your account after which you will receive a quote in advance.

Electricity
Each lot has a standard 220V socket. If you want more power and/or need three-phase power, we can meet your requirements. Please indicate this in your account and do not forget to provide extension leads (if necessary).

Internet
All lots have access to the wireless network. This is intended for normal use, such as checking your mail and visiting a website, not for downloading huge files. If you do want a permanent connection or extra bandwidth, we can arrange this for you. You can specify this in your account. The costs are € 90 (excl. VAT).

Production team
A production team is available to assist participants who have questions and/or problems. You can find us in the production office in Hall 1 of the Klokgebouw.


Reception desk
During the construction phase, you will find a desk at the back of the Klokgebouw, where you have to report before you start your construction work. This is also where you can arrange the forklift or aerial platform rentals and get participants passes to gain access to the building before the regular opening hours. There are five free passes available per stand. Extra passes cost € 2.50 per pass.

Toilet facilities
Toilet facilities are available during the construction and disassembly work and the event. The toilets will be cleaned regularly.

Catering
During the construction phase, catering facilities are present in the Klokgebouw on Thursday, October 18 and Friday, October 19. During the other days you will have to go to PopEi (Klokgebouw, short side of the building, side ring road) and Caffee Allee (Torenallee, next to DDW office).

Cleaning and waste processing 
 
As the halls are swept and cleared up every day, we can start the new day in a clean environment. For insurance reasons, we are not allowed to clean the stands, but if you want to get started, there are vacuum cleaners, brooms, and dustpan and brush available.

Parking
 
You can park at the Klokgebouw in the car park next to the building. The costs are: € 1/per hour, € 5 for a day pass. There are also parking spaces elsewhere on the site, all paid parking.

Opening hours Klokgebouw
Daily from 11.00 hrs – 18.00 hrs.

Construction and disassembly hours
Construction starts on Wednesday, October 17 and ends on Friday, October 19 at 15.00 hrs. By mutual agreement, the construction of large stands may start on Tuesday, October 16. Construction times: 09.00 hrs - 18.00 hrs.

Disassembly: Sunday, October 28 from 18.30 hrs - 21.00 hrs and Monday, October 29 from 09.00 hrs - 18.00 hrs. Please note: on Sunday, October 28, the Klokgebouw closes at 18.00 hrs.

For reasons of security, disassembly begins at 18.30 hrs exactly, because all visitors must have left the building before the exhibitors walk out with their products.

Communication
All information, text and images have to be on your profile page on August 1, 2012 at the latest. The accounts will close between August 1 and September 1, 2012 for editing purposes. After September 1, you can add information to the account and edit your communications.

Insurance
The DDW organisation is not liable for loss, theft, damage or injury to persons or damage to property that may be associated with the organisation of DDW. The participants are considered to list and insure the risks involved in participation themselves. Make sure that valuable objects such as laptops and digital cameras are not left in plain sight during the day. We also recommend not leaving these possessions unattended in the stand during the evening and night. There will be lockers at the entrance where you can store your belongings for free.

Surveillance and security
During opening hours, an event protector will guard the area. After closing time, there is CCTV.

Fire Safety Requirements
Textiles, paper, cardboard and plastics
Textiles, paper, cardboard and plastic are combustible materials and should be impregnated with a fireretardant.  At fire safety inspections, you will have to hand over a test sample of the material; in the case of doubt, the fire brigade will test this through a fire test.

Wooden constructions and stacked wood
Wooden constructions and wood that has been stacked can be hazardous as a fire source. Wood must be impregnated with a fire-retardant and regularly moistened. It must furthermore be ensured that no litter can pile up between the wooden materials.

Polystyrene blocks, polystyrene granules, foam rubber and agricultural plastics
These materials are highly combustible and emit chemical gasses, and are therefore not allowed to be used. Exceptions are those materials for which a certificate of flammability can be produced.

Volatile liquids and gasses
The storage of volatile substances and gasses at your lot is forbidden.

Fire reels and fire extinguishers
Take note of the locations of fire reels and fire extinguishers. In the event of a fire, you have to use these and immediately call the production management in the Klokgebouw. Fire reels and fire extinguishers present at your lot must always be kept free.

Should the fire department reject your stand/lot at their inspection, note that this falls under your own responsibility and not under the responsibility of the DDW organisation.  You will have to remove the materials concerned from the building.

Questions
For questions about the Klokgebouw, contact organisation DDW, klokgebouw@ddw.nl.
 

 
 
Our work is about developing systems that have the right amount of sensitivity” Raw Color